Service · Kitchens

Kitchen Remodeling in the Inland Empire

Custom cabinetry, stone countertops, and tile work delivered by the same Construction Station crew you meet on day one. No subs. No surprises. No shortcuts.

Residential & Commercial Construction · Inland Empire
18
Years Experience
Hundreds
Projects Completed
5★
Average Rating
#1108879
Licensed
A+
BBB Rated
0%
Financing Available
Our Work

Real kitchens, real homes.

Kitchen remodel completed by Construction Station — Inland Empire
Modern kitchen remodel with quartz countertops and shaker cabinets
Luxury kitchen remodel with custom cabinetry and stone counters
Open concept kitchen transformation with large island
Full kitchen transformation in the Inland Empire
3D kitchen design rendering by Construction Station
Free Resource

Not ready to talk? Get our free guide.

Before you call anyone, arm yourself with the numbers. Our 2026 cost guide covers everything Inland Empire homeowners need to know — average prices, how to compare bids, and the five mistakes that blow kitchen budgets.

Instant download. No spam. Unsubscribe anytime.

FREE

2026 Kitchen Remodel Cost Guide

What Inland Empire homeowners need to know before starting their project

  • Average costs for IE kitchen remodels
  • Cost breakdown by component
  • Timeline and what to expect
  • 5 costly mistakes to avoid
  • How to choose the right contractor

We’ll email you the guide instantly. No spam, unsubscribe anytime.

Overview

The kitchen is the most worked-in, most photographed, and most argued-over room in any home. We’ve been remodeling them across the Inland Empire since 2008 — over 250 kitchens completed across Redlands, Yucaipa, Riverside, Rancho Cucamonga, and surrounding cities.

Our scope is comprehensive. We design and install custom shaker, slab, and inset cabinetry, fabricate quartz, granite, and marble countertops, and execute precision tile and stone work. From a galley refresh to a full open-concept transformation, the same crew handles framing, electrical, plumbing, drywall, tile, cabinetry, and final touch-ups.

Custom cabinetry sets the tone of the room. We offer fully custom-built options as well as semi-custom lines from Shiloh, Wellborn, and Decora. Our installers obsess over reveals, scribe lines, and crown returns — the small details that separate $40k kitchens from $80k kitchens.

Countertops are templated digitally for seamless seams. Quartz options like Caesarstone, Cambria, and Silestone run alongside natural granite and marble selections from local stone yards. We walk every slab in person before fabrication.

Islands are where most kitchens live or die. Our designer studies your traffic patterns, prep zones, and seating needs before drafting a layout. Waterfall edges, prep sinks, integrated outlets, drawer dishwashers, and microwave drawers are all on the table.

Appliance integration is engineered into the layout from day one. We’re Wolf, Sub-Zero, Thermador, and Bosch installers, and we coordinate directly with appliance reps to confirm rough-in dimensions and venting before drywall closes up.

Lighting and electrical are not afterthoughts. Layered lighting plans (recessed, pendants, undercabinet, toe-kick) are part of every design. Dedicated circuits for the disposal, dishwasher, microwave, and induction range are part of every install.

Flooring options include large-format porcelain tile, engineered hardwood, solid hardwood (sand-and-finish or pre-finished), and luxury vinyl plank. We handle subfloor leveling, vapor barriers, and transitions between rooms so the finished surface looks like it was always there.

Most importantly: we’re a single point of contact from design through final walkthrough. One project manager, one written schedule, one warranty. With 18 years in the Inland Empire and over 500 projects completed, we’ve built a reputation on showing up, hitting dates, and finishing what we start.

Our Process

From idea to reveal.

01

Free Design Consultation

60-minute in-home walkthrough. Normally $299 — free for new clients.

02

3D Design Rendering

Photoreal renderings before a single cabinet is ordered.

03

Permits & Materials

We pull every permit and lock material pricing before demo.

04

Expert Installation

Our W-2 crew. No revolving subs. Site protected daily.

05

Walkthrough & Touch-Ups

Punch list completed before final invoice. Two-year workmanship warranty.

FAQ

Questions, answered.

Kitchen remodel costs in the Inland Empire range from $35,000–$60,000 for a mid-grade refresh (new cabinets, countertops, flooring, and appliances without structural changes), $60,000–$100,000 for a full remodel with semi-custom cabinetry and stone countertops, and $100,000–$150,000+ for a luxury remodel with custom-built cabinetry, high-end appliances, and structural changes such as opening walls. The biggest cost drivers are cabinet quality (stock vs. semi-custom vs. fully custom), whether you're moving plumbing or gas lines, countertop material, and appliance tier. Construction Station provides a transparent, line-item written estimate after your free in-home design consultation — no vague 'starting at' pricing.
Most full kitchen remodels with Construction Station take 4–8 weeks from demo to final walkthrough. A cosmetic refresh — new cabinet doors, countertops, and appliances without moving plumbing or electrical — can finish in 3–4 weeks. Full gut remodels with custom cabinetry (4–8 week manufacturing lead time), layout changes, and new flooring typically run 8–12 weeks total. We provide a written project schedule before you sign anything, with each phase and its expected start and finish date.
Our process: (1) Free design consultation — in-home walkthrough to measure, discuss layout, and review your wish list; (2) 3D photorealistic rendering of the finished kitchen before any orders are placed; (3) Material selection — cabinet, countertop, tile, and flooring samples; (4) Permitting — we pull any required permits; (5) Demolition — existing cabinets, countertops, flooring, and fixtures removed; (6) Rough work — plumbing, electrical, or structural modifications; (7) Cabinet installation; (8) Countertop templating and installation; (9) Tile and backsplash; (10) Flooring; (11) Appliance installation; (12) Final walkthrough and punch list. One crew, one warranty, one point of contact from design through keys.
It depends on scope. A cosmetic remodel — replacing cabinets in the same location, new countertops, tile, and appliances — typically does not require permits. If you're moving plumbing (relocating the sink, adding a gas line), adding dedicated electrical circuits, or making structural changes (removing walls, adding a beam), permits are required. Construction Station pulls all required permits as part of your project and schedules all inspections. We'll tell you up front which elements require permits and handle the process on your behalf.
If your cabinet boxes are solid and the layout works, cabinet refacing or door replacement can refresh the look for 40–60% of the cost of new cabinets. If the layout is inefficient, the boxes are failing, or you want to change the footprint, a full remodel is the better investment. Cabinet refacing typically runs $8,000–$20,000; a full kitchen remodel with new cabinets starts around $35,000. The right answer depends on cabinet condition, how long you plan to stay, and what's actually bothering you about the kitchen. We give you an honest assessment during the free consultation — no pressure to sell more than you need.
The most popular layouts in Inland Empire homes: L-shape (efficient use of corner space, works well in open-concept homes), U-shape (maximum storage and counter space, ideal for serious cooks), galley (efficient for narrower kitchens with high traffic flow), and island or peninsula (adds prep space and casual seating, works in most open-concept layouts). Our designer will assess your existing footprint, traffic patterns, and family use to recommend the optimal configuration. Sometimes a minor reconfiguration — moving a doorway or removing a non-load-bearing wall — dramatically improves function without a complete gut.
Yes — most clients do. You'll temporarily lose access to the kitchen itself for 4–8 weeks. Many families set up a temporary kitchen with a microwave, electric skillet, mini-fridge, and coffee maker in the dining room or garage. We install construction-grade barriers to contain dust and protect adjacent rooms, clean the site daily, and schedule deliveries to minimize driveway disruption. Families with young children or special dietary needs should budget for restaurant and grocery delivery spending during the active phase.
Quartz (engineered stone) is our most popular recommendation — non-porous (no sealing required), extremely durable, and available in hundreds of colors. We install Caesarstone, Cambria, and Silestone regularly. Natural granite adds unique character and holds up well with periodic sealing. Quartzite offers marble-like aesthetics with better hardness. Marble is beautiful but porous and prone to etching from acids — best in lower-traffic areas or for clients who embrace natural patina. Modern laminate countertops work well for budget-conscious remodels. We walk every natural stone slab in person before fabrication.
Start with door style — shaker is the most popular and timeless, flat-panel is contemporary, raised-panel is traditional. Then consider face-frame vs. frameless construction, material (plywood box vs. MDF, solid wood vs. thermofoil doors), and finish (paint, stain, or factory laminate). The biggest value decision is stock vs. semi-custom vs. custom. We carry semi-custom lines from Shiloh, Wellborn, and Decora — quality products with hundreds of configurations at mid-range pricing. During your design consultation we'll show samples from all tiers and help you match cabinet quality to your budget and timeline.
Stock cabinets are pre-manufactured in standard 3-inch width increments, available off the shelf — fastest and least expensive, but limited configuration. Semi-custom cabinets are manufactured to order in more size increments with more door styles, finish options, and interior accessories — 3–8 week lead times, 30–60% more than stock. Custom cabinets are built to your exact dimensions by a cabinet maker — maximum flexibility and quality, but 8–16 week lead times and the highest cost. For most $50,000–$100,000 kitchen remodels, semi-custom delivers the best balance of quality, customization, and price. Full custom makes sense for unique spaces, luxury builds, or exact-fit requirements.
Yes — completely. Construction Station is a licensed general contractor (CSLB #1108879), not just a cabinet installer. We handle all trades: plumbing (sink connections, garbage disposal, dishwasher, gas lines, pot filler), electrical (dedicated circuits for dishwasher, disposal, microwave, and range; under-cabinet lighting; pendant wiring; GFCI outlets), and any structural work. Our licensed tradespeople handle all rough and finish work under our general contractor license — one accountable party for the entire project, one permit package, one warranty.
In Inland Empire real estate, the features that consistently add the most resale value: quartz or stone countertops (buyers notice immediately), updated cabinet faces with soft-close hardware (critical in the $400K–$700K market), a functional island with seating, updated lighting (recessed cans plus pendants over the island), and stainless or panel-ready appliances. Kitchen remodels in the Inland Empire generally return 60–80% of cost at resale — higher for homes priced under $600K, where kitchen condition directly influences offers.
Appliance budgets range from $3,000–$6,000 for mid-grade (GE, Whirlpool, Frigidaire), $6,000–$15,000 for premium (Bosch, KitchenAid, Samsung), and $15,000–$40,000+ for luxury (Wolf, Sub-Zero, Thermador, Miele). Construction Station installs all tiers and coordinates directly with appliance reps to confirm rough-in dimensions. A common mistake: clients allocate nearly all their budget to cabinetry and countertops and are surprised by appliance costs. We include a recommended appliance budget in every estimate so you have the complete picture before signing.
Yes — phased remodels work for clients who want to spread costs or minimize disruption. A common sequence: Phase 1 — countertops and sink (high visual impact, short disruption); Phase 2 — cabinets and flooring; Phase 3 — appliances and lighting. The tradeoffs: phased work costs more overall due to multiple mobilizations and potential rework between stages. If budget is the main driver, we can prioritize which elements deliver the most value improvement per dollar so you start with the highest-impact changes first.
Yes. Every kitchen remodel starts with a free in-home design consultation — normally $299, included at no charge for new clients. Our designer measures your space, discusses your lifestyle and cooking habits, reviews your inspiration images, and develops a floor plan with cabinet layout. We then produce 3D photorealistic renderings showing the finished kitchen — every cabinet, countertop, tile, and fixture — before any order is placed. The design process is included in your project cost; we don't charge separately for revisions. Our goal is for you to love the design on paper before construction begins.
Free Consultation

Ready to talk? Pick a time.

Book your free 60-minute design consultation directly on our calendar. Normally $299 — free for new clients. No obligation, no high-pressure pitch.

Ready Now?

Call us directly.

Speak with a project coordinator right now. We answer during business hours and return all missed calls within 30 minutes.

909-797-6333
Request a Callback

Prefer us to call you?

Leave your name and number and we’ll reach out within 2 business hours to discuss your project — no obligation, no high-pressure sales call.

Response within 2 business hours
Free in-home estimate included
No obligation, ever
Get a Callback

Prefer us to call you?

Leave your info and we’ll reach out within 2 business hours.

No obligation. We’ll never sell your info.

Call NowFree Estimate →